Chamber Under Parking Lot
The thermal energy supply for the 1.7 MW heating and cooling system of the Budapest District 4 Administration and Mayor’s Office and the New Market building is channeled through two thermal centers. One is under a parking lot in a 280 m2 reinforced concrete structure, while the other is in the basement of the New Market.
We use wastewater heat recovery centers and provide the heat source via wastewater from the main sewers located in a 2.6 m2 area under St. Stephen square.
250 m3/h
Flow of Sewage
1690 kW
Heat Pump capacity (heating)
1748 kW
Heat Pump capacity (cooling)
3.85
Efficiency (COP)